The effective date determines when your schedule goes into effect. A job cannot run prior to its effective date. By default, the effective date is the current date.
To set the effective date for a job schedule
-
Determine the type of job that you want to schedule, and then on the navigation bar, click the appropriate button.
For example, to schedule a backup job, click the arrow next to Backup.
-
To select run days for a new job
Continue to step 5.
To edit run days for an existing job
Click Edit Schedule Details.
-
On the Calendar Schedule tab, under Edit Calendar schedule by, click Effective Date.
-
Verify that the Make the schedule go into effect on check box is checked.
-
Select the date on which you want the schedule to go into effect.